1. Raw material mixing process
Facility | Compounder |
---|---|
Way | Put raw materials, pigments, and scrap in the blender and mix to mix evenly |
2. Mold placing process
Facility | Blow molding machine |
---|---|
Way | After checking the mold condition, place the mold on the blow molding machine. |
3. Product setting process
Facility | Blow molding machine |
---|---|
Way | Set the blow molding machine conditions according to the work standard |
4. First article inspection and molding process
Facility | Blow molding machine |
---|---|
Way | Insert insert into mold Production of first article, and production work when cutting inspection is good |
5. post-processing
Facility | Drill and hole cutter, sharpening knife |
---|---|
Way | After molding, post-processing of the fuel tank filling port and the nipple of the fuel sender assembly |
6. Washing process
Facility | Air blow, vacuum cleaner |
---|---|
Way | Air blow cleaning → vacuum cleaning → secondary processing → final cleaning → washing inspection |
7. Assembly and inspection process
Facility | Assembly tool, ultrasonic thickness gauge |
---|---|
Way | Assembling the fuel hose, fuel sensor, etc. after inspecting the fuel tank appearance, dimensions, and thickness |
8. leak test
Facility | leak tester |
---|---|
Way | After connecting fuel tank to leak tester, leak test with 0.3Bar withstand pressure |